Project overview
Connect Install delivered a nationwide seasonal promotional graphics rollout across more than 100 Aldi stores in Ireland over a 1-2 month period. The project involved replacing and updating graphics across live retail environments, with works carried out during trading hours and with minimal disruption to store operations.
Client / project context
This was a multi-site rollout in the grocery retail sector, delivered as part of a wider repeat programme. The work was time-sensitive, with multiple locations needing to be completed each day, and consistency across all sites was important to the success of the campaign.
Scope delivered
Connect Install delivered:
- graphics installation
- coordinated production and install delivery
- reporting and closeout
Key delivery challenges
The main challenge was delivering at scale across live trading stores during normal operating hours. The programme required disciplined coordination, multiple site visits per day, and the ability to manage changes during delivery without affecting pace, finish quality, or overall rollout consistency.
How Connect Install approached it
Scope and survey information were provided at the outset, allowing the team to focus on organised rollout delivery. Production and installation were coordinated closely, operations managed the programme day to day, and installers delivered efficiently across the live store estate. Changes during the rollout were handled through the operations team, and closeout was managed in a structured way to keep reporting clear and the programme moving.
Outcome
The rollout was completed cleanly and on time across more than 100 locations, with strong consistency from site to site and minimal disruption to trading stores. The works were delivered within the required access windows, reporting was completed properly, and the programme led to repeat work.
Proof points
- Sector: Grocery retail
- Location: Nationwide Ireland
- Service lane: Rollout - graphics
- Sites delivered: 100+
- Programme duration: 1-2 months
- Crew structure: 4 teams, 2 installers per team
- Works delivered in live stores: Yes
- Reporting delivered: Yes
- Repeat programme: Yes
Why this case study matters
This project demonstrates Connect Install’s ability to deliver repeatable, time-sensitive, multi-site rollout work across live retail environments with clean execution, strong coordination, and reliable closeout.