HubSpot Ground Floor Refresh
Project overview
Connect Install delivered a branded ground floor refresh in Dublin, including illuminated signage, wayfinding, window graphics, and a bespoke corten steel sign as part of an updated workplace environment. The project combined multiple visual elements within one programme and had to be delivered cleanly in a live office setting within a tight timeframe.
Client / project context
This project was delivered in a commercial workplace environment at a single Dublin site, supporting a wider visual refresh of the ground floor area. The works were time-sensitive and had to be completed in a live operational environment, with finish quality and coordination important to the overall handover.
Scope delivered
Connect Install delivered:
- installation of 2 illuminated signs
- installation of wayfinding signage
- installation of window graphics across 4 window areas
- installation of a bespoke corten steel sign
- coordination of part-production with suppliers
- reporting and closeout
Survey support was provided by Focus Branding, with production coordinated between suppliers and Connect Install.
Key delivery challenges
The project had to be delivered within a live workplace environment and to a tight deadline, while coordinating different signage and graphic elements across the same refresh programme. Some installation points were physically awkward and more difficult to access, which increased the care needed to achieve a clean finish without affecting the surrounding environment.
How Connect Install approached it
Scope verification and survey support were led by Focus Branding, with Connect Install coordinating closely on planning, production, and installation delivery. The programme was organised to keep works controlled within the live environment, and closeout was managed through operations to maintain visibility and support a smooth handover.
Outcome
The refresh was completed on time and to a high standard, with all visual elements installed cleanly and with minimal disruption to the live office environment. The project delivered a stronger branded arrival and ground floor presence, achieved a clean handover, and resulted in strong feedback and repeat work.
Proof points
- Sector: Workplace / office environment
- Location: Dublin
- Service lane: Fit-Out Completion & Interior Install Packages
- Site count: 1
- Programme duration: 1-2 weeks
- Crew size: 2 installers
- Delivered in live environment: Yes
- Reporting delivered: Yes
- Repeat work followed: Yes
Why this case study matters
This project shows Connect Install’s ability to deliver mixed branded refresh scopes in live workplace environments where quality, coordination, and clean handover matter as much as speed.